XIV. BUILDINGS


XIV.  Buildings:  Office, Warehouse, Industrial

  A.  Available Buildings................................................  []
      1.  Location.......................................................  []
      2.  Year built.....................................................  []
      3.  Owner..........................................................  []
      4.  Total number of square feet, usable square feet................  []
      5.  Condition of building..........................................  []
      6.  Current zoning, transferbility.................................  []
      7.  Date of availibility...........................................  []
      8.  Neighborhood environment, appearance of surroundings...........  []
      9.  Photographs and floor plans....................................  []
     10.  Suitability of building for warehousing, manufacturing.........  []
     11.  Type of construction (steel, masonry, other)...................  []
     12.  Floor type.....................................................  []
     13.  Floor loadings.................................................  []
     14.  Number of stories..............................................  []
     15.  Ceiling height.................................................  []
          a.  Ceiling clearance and column spacing.......................  []
     16.  Suitability for special equipment..............................  []
     17.  Heating system.................................................  []
          a.  Type.......................................................  []
          b.  Btu........................................................  []
     18.  Air conditioning system........................................  []
          a.  Type.......................................................  []
          b.  Size.......................................................  []
          c.  Capacity...................................................  []
     19.  Humidity control...............................................  []
     20.  Building insulation............................................  []
     21.  Sprinkler system...............................................  []
          a.  Type of system.............................................  []
          b.  Size of tank...............................................  []
          c.  Pressure...................................................  []
          d.  Number of fire extinguishers...............................  []
          e.  Fire detection system......................................  []
          f.  Fire water storage.........................................  []
     22.  Distance to nearest fire station...............................  []
     23.  Distance to nearest fire plug..................................  []
     24.  Hydrants on site...............................................  []
     25.  Insurance rating...............................................  []
     26.  Existing special facilities (such as computer room)............  []
     27.  Oil storage....................................................  []
     28.  Propane storage................................................  []
     29.  Availibility  of rail siding...................................  []
     30.  Number of parking spaces available.............................  []
     31.  Truck docks available..........................................  []
     32.  Existing tax assesment.........................................  []
     33.  Sale price and terms, or leasing costs.........................  []
     34.  Size of site...................................................  []

  B.  Leasing Data.......................................................  []
      1.  Nature and duration of lease...................................  []
      2.  Description of premises, including appurtenances...............  []
      3.  Renewal and purchase options and options for additional space..  []
      4.  Right of first refusal on additional space.....................  []
      5.  Right to lease adjacent or substitute space....................  []
      6.  Availability of month-to-month tenancy when holding over.......  []
      7.  Rent...........................................................  []
          a.  Amount.....................................................  []
          b.  When and how payable.......................................  []
      8.  Grace period...................................................  []
      9.  Escalations....................................................  []
          a.  In real estate taxes.......................................  []
          b.  In building operating expenses.............................  []
          c.  Basis for escalation (CPI, etc.)...........................  []
     10.  Penalty for early termination..................................  []
     11.  Right of possession............................................  []
     12.  Measure of damages.............................................  []
     13.  Subletting and assignment......................................  []
     14.  Responsibility for taxes, other expenses.......................  []
     15.  Building services, utilities furnished by landlord.............  []
          a.  Heating (hours supplied)...................................  []
          b.  Air conditioning (hours supplied)..........................  []
          c.  Janitorial.................................................  []
          d.  Window cleaning............................................  []
          e.  Building maintenance.......................................  []
          f.  Security...................................................  []
          g.  Parking....................................................  []
          h.  Exterminating service......................................  []
          i.  Water......................................................  []
          j.  Exterior grounds maintenance and snow removal..............  []
     16.  Leasehold improvements allowance...............................  []
     17.  Number of parking spaces included in lease.....................  []
     18.  Right to erect signs, other advertising matter.................  []
     19.  Responsibility for repairs and conformity with building codes, 
          laws...........................................................  []
     20.  Title, zoning and other restrictions on use of land............  []
     21.  Liability, insurance coverage and subrogation..................  []
     22.  Destruction or condemnation of premises........................  []
     23.  Building and construction of new leased facilities (Specify 
          location, date of construction completion, type of construction,
          etc.)..........................................................  []
     24.  Permissable uses...............................................  []
     25.  Right to install satellite antenna on roof.....................  []

  C.  Points to Cover in Leases on Public Property (Such as an Airport)..  []
      1.  Term adequate for financing:  50 years or shorter term with 
          option to extend...............................................  []
      2.  Reslistic subordination provision to permit financing..........  []
      3.  Lessee to have right to substitute a joint venture or subsidary,
          sublease or assign.............................................  []
      4.  Lessor to provide survey of property...........................  []
      5.  FAA reversion clause to be modified (if necessary) to provide that
          parcel leased not be recaptured if improper use made of other
          sites on airport by other lessees..............................  []
      6.  Height restrictions and building restriction lines affecting site
          not to be changed during lease term............................  []
      7.  Taxiway access guarantee.......................................  []

  D.  Points to cover in an appraisal....................................  []
      1.  Letter of transmittal..........................................  []
      2.  Purpose of appraisal...........................................  []
      3.  Date...........................................................  []
      4.  Rights to be appraised.........................................  []
      5.  Legal description of property..................................  []
      6.  Highest and best use...........................................  []
      7.  Zoning.........................................................  []
      8.  Tax history....................................................  []
      9.  Area description...............................................  []
     10.  Site description...............................................  []
     11.  Building description...........................................  []
     12.  Value of land, with comparables................................  []
     13.  Value determined from cost.....................................  []
     14.  Value determined from income...................................  []
     15.  Photos, maps, plats............................................  []
     16.  Certification of the appraiser.................................  []

  E.  Office-of-the-future concept special requirements..................  []
      1.  Wire management, cabling.......................................  []
          a) Raised floor................................................  []
          b) Ceiling trays...............................................  []
          c) Vertical chases.............................................  []
          d) Conduit in ceiling, building code...........................  []
          e) Teflon cable, cost..........................................  []
      2.  Power supply...................................................  []
          a) Central motor-generator set ................................  []
          b) Emergency generator.........................................  []
          c) Battery back-up units.......................................  []
      3.  HVAC requirements..............................................  []
          a) More air supply and exhaust capacity, work areas............  []
          b) Removal of gaseous pollutants from electronics..............  []
          c) More moisture to prevent dry air in winter..................  []
          d) Dust and particulate control................................  []
          e) More capacity for heat removal..............................  []
          f) More capacity for humidity control..........................  []
      4.  Lighting.......................................................  []
          a) Glare prevention for CRT work areas.........................  []
          b) Special lighting electronic service areas...................  []
      5.  Energy management..............................................  []
          a) Dual thickness insulating windows...........................  []
          b) Insulated roof, U:0.08 or better............................  []
          c) Insulated exterior walls U:0.1 or better....................  []
          d) Low pressure air system.....................................  []
      6.  Telecommunications facilities..................................  []
          a) Videoconference room........................................  []
          b) Satellite antenna...........................................  []
          c) Microwave antenna...........................................  []
      7.  Shared services (intelligent buildings)........................  []
          a) Lease or sale of telephone equipment........................  []
          b) Lease or sale of data processing equipment and 
             services....................................................  []
          c) Automatic billing, analysis, and cost reporting of 
             phone service, teleconferencing, data transfer..............  []
          d) Packet-switching network interface..........................  []
          e) Auto log-on for on-line data services ......................  []
          f) Phone answering and message services........................  []
          g) Electronic fire, security, surveillance systems.............  []
          h) LAN permitting multi-user printers, peripherals.............  []
          i) Track record of shared-service provider.....................  []
          j) Back-up provisions if system goes down......................  []
          k) Are technical support people on site?.......................  []
          l) Is system compatible with company's other systems?..........  []
          m) Will company's data be secure?..............................  []
      8.  Space requirements.............................................  []
          a) More space for work stations with peripherals...............  [] 
          b) Increased floor/floor height................................  []
          c) Electronic printing area....................................  []
          d) Electronic mail center......................................  []  

  F.  Furniture, fixtures, miscellaneous assets..........................  []
      1.  Mail room equipment............................................  []
      2.  Kitchen equipment..............................................  []
      3.  Dishes, cutlery, utensils......................................  []
      4.  Art, framed pictures, sculpture................................  []
      5.  Vending machines...............................................  []
      6.  Graphics, signage..............................................  []
      7.  Carpets........................................................  []
      8.  Conference room, A/V equipment.................................  []
      9.  Plants, planters...............................................  []
     10.  Security systems, devices......................................  []
     11.  Flagpole, flags................................................  []
     12.  Mailbox........................................................  []
     13.  Fire extinguishers.............................................  []
     14.  Recreational, exercize equipment...............................  []
     15.  Vehicles.......................................................  []
     16.  Tools, maintenance equipment...................................  []
     17.  Exhibits, models...............................................  []
     18.  System furniture...............................................  []
     19.  Other furniture................................................  []

  G.  Facilities for R&D, science activities.............................  [] 
      1.  Animal care rooms..............................................  []
      2.  Clean rooms....................................................  []
      3.  Cold rooms.....................................................  []
      4.  Hazardous reaction rooms.......................................  []
          a) High pressure cells, vents..................................  []
          b) Barricades..................................................  []
          c) Showers.....................................................  []
          d) Explosion management........................................  []
      5.  Radiation labs.................................................  []
      6.  Toxic waste disposal...........................................  []
      7.  High energy labs...............................................  []
      8.  Special HVAC, fume hoods.......................................  []
      9.  Special fire protection........................................  []
     10.  First aid facility.............................................  []  

[Next Page]| [Return to Checklist]| [Home page]
Copyright 1995 Conway Data, Inc. All rights reserved Legal Notice: Because data comes from many sources, Conway Data can assume no responsibility for accuracy or currency.