III. CRITERIA FOR SITE AND FACILITY


III. Criteria for Site and Facility    

     A. Project Overview.................................................  []
        1. General purpose of facility...................................  []
        2. Operating unit(s) that will occupy facility...................  []
        3. Desired dates for:............................................  []
           a. Initial operations.........................................  []
           b. Peak production............................................  []

     B. Company Location Criteria........................................  []
        1. Market to be served...........................................  []
        2. Approximate location of market center.........................  []
        3. Description and volume of product to be manufactured..........  []
        4. Modes of shipment of product..................................  []
        5. Raw materials and supplies required...........................  []
        6. Approximate location of supplier center.......................  []
        7. Modes of shipment of raw materials............................  []
        8. Staffing of the facility (percent living in area, percent to be
           transferred from other company plants, percent to be recruited 
           from outside the area)........................................  []
           a. Executive..................................................  []
           b. Professional...............................................  []
           c. Technical..................................................  []
           d. Other......................................................  []
        9. Projected total employment....................................  []
           a. Executive..................................................  []
           b. Professional...............................................  []
           c. Technical..................................................  []
           d. Other (skilled, semi-skilled, unskilled)...................  []
           e. Percent union..............................................  []
           f. Percent non-union..........................................  []
           g. Percent male...............................................  []
           h. Percent female.............................................  []
       10. Wage rates to be paid for:....................................  []
           a. Executive..................................................  []
           b. Professional...............................................  []
           c. Technical..................................................  []
           d. Other (skilled, semi-skilled, unskilled)...................  []
       11. Number of shifts and days per week facility will operate......  []
       12. Desired population of area....................................  []
       13. Maximum impact of your facility's work force on total community
           work force....................................................  []
       14. Type of location desired......................................  []
           a. Within Central Business District...........................  []
           b. Within Standard Metropolitan Statistical Area..............  []
           c. Small town or rural area...................................  []
       15. Need to minimize security risks...............................  []
           a. Key personnel..............................................  []
           b. Records....................................................  []
           c. EDP systems................................................  []
           d. Emergency relocation plan..................................  []

     C. Site and Building Criteria.......................................  []
        1. Building area required(initial and foreseeable expansion needs).[]
           a. Production.................................................  []
           b. Storage....................................................  []
           c. Shipping, receiving, warehousing...........................  []
           d. Office.....................................................  []
           e. Research and engineering...................................  []
           f. Data processing............................................  []
           g. Employee services..........................................  []
           h. Building services..........................................  []
           i. Other......................................................  []
        2. Building type.................................................  []
           a. Special purpose............................................  []
           b. Multi-purpose..............................................  []
        3. Description...................................................  []
           a. Number of floors...........................................  []
           b. Clear height...............................................  []
           c. Bay space..................................................  []
           d. Floor load requirements....................................  []
           e. Freight elevators..........................................  []
           f. Conveyors..................................................  []
           g. Other (cranes, clean rooms, etc.)..........................  []
        4. Specific architectural requirements...........................  []
           a. Doors, openings............................................  []
           b. Lighting level (interior, exterior)........................  []
           c. HVAC.......................................................  []
           d. Floor padding..............................................  []
           e. Floor drains...............................................  []
           f. Interior design............................................  []
        5. Other land requirements.......................................  []
           a. Access and interior roads..................................  []
           b. Parking....................................................  []
           c. Rail siding................................................  []
           d. Outdoor storage............................................  []
        6. Transportation facilities.....................................  []
           a. Rail siding car capacity...................................  []
           b. Number of truck docks required.............................  []
           c. Waterfront docks, wharves..................................  []
           d. Special requirements (container facilities,etc.)...........  []
        7. Electric power requirements (start and peak) for prime components
           of operation (lighting, machine operation, air conditioning,
           welding, furnaces)............................................  []
           a. KW demand..................................................  []
           b. Kwh monthly consumption....................................  []
           c. Power factor (%)...........................................  []
           d. Load factor (%)............................................  []
           e. Special load characteristics...............................  []
           f. Primary service voltage and phases.........................  []
           g. Company-owned or utility-owned transformers................  []
        8. Natural gas requirements (start and peak).....................  []
           a. mcf/year...................................................  []
           b. mcf/hour...................................................  []
        9. Alternate fuel requirements...................................  []
       10. Water requirements (start and peak)...........................  []
           a. Sanitary gpd...............................................  []
           b. Process water gpd..........................................  []
           c. Air conditioning gpd.......................................  []
           d. Cooling water gpd..........................................  []
           e. Percent to be recirculated.................................  []
           f. Special characteristics (purity, temperature, pressure, chemical
              content, salinity, hardness, etc.).........................  []
           g. Type of fire protection required...........................  []
           h. Sinks, drinking fountains required.........................  []
       11. Sewage and waste treatment (start and peak)...................  []
           a. Sanitary gpd...............................................  []
           b. Process gpd................................................  []
           c. Special waste treatment required...........................  []
           d. Solid wastes...............................................  []
       12. Provisions for unusual or special operations..................  []
           a. Fire, explosion or health hazards associated with materials used
              in process.................................................  []
           b. Conditions resulting from operation (dust, odors, fumes, smoke,
              noise, vibration, etc.)....................................  []
           c. Special treatment required (smoke abatement, dust extraction, 
              etc.)......................................................  []
           d. Security risks to which operation may be exposed...........  []
           e. Computer room..............................................  []
       13. Safety equipment..............................................  []
           a. Safety shower..............................................  []
           b. Eye wash...................................................  []
           c. Sprinklers.................................................  []
           d. Fire hose..................................................  []
           e. Extinguishers..............................................  []
           f. Fire water storage.........................................  []
       14. Communications requirements...................................  []
           a. Special site requirements for antennae, satellite reception,
              microwave, radio, etc......................................  []
           b. Services available at site.................................  []
           c. Requirements within facility...............................  []
              -- Telephones (voice, voice/data)..........................  []
              -- Time clocks.............................................  []
              -- Other clocks............................................  []
              -- Paging systems..........................................  []
              -- Music...................................................  []
       15. Security/disaster preparedness requirements...................  []
           a. Access to site, building...................................  []
           b. Self-contained services....................................  []
              -- Power...................................................  []
              -- Water...................................................  []
              -- Fuel storage............................................  []
           c. Perimeter protection.......................................  []
           d. Screening of site, building................................  []
           e. Protection against natural, man-made disasters.............  []
       16. Total land area required......................................  []
           a. Number of acres for plant, roads, rail, parking, storage,
              utilities, easements.......................................  []
           b. Special configurations or characteristics (shape of tract,
              orientation, elevation, soil bearing, etc.)................  []
           c. Recreation.................................................  []
           d. Landscaping................................................  []
           e. Acres to be fenced, paved..................................  []

[Next Page]| [Return to Checklist]| [Home page]
Copyright 1995 Conway Data, Inc. All rights reserved Legal Notice: Because data comes from many sources, Conway Data can assume no responsibility for accuracy or currency.