III. CRITERIA FOR SITE AND FACILITY
III. Criteria for Site and Facility
A. Project Overview................................................. []
1. General purpose of facility................................... []
2. Operating unit(s) that will occupy facility................... []
3. Desired dates for:............................................ []
a. Initial operations......................................... []
b. Peak production............................................ []
B. Company Location Criteria........................................ []
1. Market to be served........................................... []
2. Approximate location of market center......................... []
3. Description and volume of product to be manufactured.......... []
4. Modes of shipment of product.................................. []
5. Raw materials and supplies required........................... []
6. Approximate location of supplier center....................... []
7. Modes of shipment of raw materials............................ []
8. Staffing of the facility (percent living in area, percent to be
transferred from other company plants, percent to be recruited
from outside the area)........................................ []
a. Executive.................................................. []
b. Professional............................................... []
c. Technical.................................................. []
d. Other...................................................... []
9. Projected total employment.................................... []
a. Executive.................................................. []
b. Professional............................................... []
c. Technical.................................................. []
d. Other (skilled, semi-skilled, unskilled)................... []
e. Percent union.............................................. []
f. Percent non-union.......................................... []
g. Percent male............................................... []
h. Percent female............................................. []
10. Wage rates to be paid for:.................................... []
a. Executive.................................................. []
b. Professional............................................... []
c. Technical.................................................. []
d. Other (skilled, semi-skilled, unskilled)................... []
11. Number of shifts and days per week facility will operate...... []
12. Desired population of area.................................... []
13. Maximum impact of your facility's work force on total community
work force.................................................... []
14. Type of location desired...................................... []
a. Within Central Business District........................... []
b. Within Standard Metropolitan Statistical Area.............. []
c. Small town or rural area................................... []
15. Need to minimize security risks............................... []
a. Key personnel.............................................. []
b. Records.................................................... []
c. EDP systems................................................ []
d. Emergency relocation plan.................................. []
C. Site and Building Criteria....................................... []
1. Building area required(initial and foreseeable expansion needs).[]
a. Production................................................. []
b. Storage.................................................... []
c. Shipping, receiving, warehousing........................... []
d. Office..................................................... []
e. Research and engineering................................... []
f. Data processing............................................ []
g. Employee services.......................................... []
h. Building services.......................................... []
i. Other...................................................... []
2. Building type................................................. []
a. Special purpose............................................ []
b. Multi-purpose.............................................. []
3. Description................................................... []
a. Number of floors........................................... []
b. Clear height............................................... []
c. Bay space.................................................. []
d. Floor load requirements.................................... []
e. Freight elevators.......................................... []
f. Conveyors.................................................. []
g. Other (cranes, clean rooms, etc.).......................... []
4. Specific architectural requirements........................... []
a. Doors, openings............................................ []
b. Lighting level (interior, exterior)........................ []
c. HVAC....................................................... []
d. Floor padding.............................................. []
e. Floor drains............................................... []
f. Interior design............................................ []
5. Other land requirements....................................... []
a. Access and interior roads.................................. []
b. Parking.................................................... []
c. Rail siding................................................ []
d. Outdoor storage............................................ []
6. Transportation facilities..................................... []
a. Rail siding car capacity................................... []
b. Number of truck docks required............................. []
c. Waterfront docks, wharves.................................. []
d. Special requirements (container facilities,etc.)........... []
7. Electric power requirements (start and peak) for prime components
of operation (lighting, machine operation, air conditioning,
welding, furnaces)............................................ []
a. KW demand.................................................. []
b. Kwh monthly consumption.................................... []
c. Power factor (%)........................................... []
d. Load factor (%)............................................ []
e. Special load characteristics............................... []
f. Primary service voltage and phases......................... []
g. Company-owned or utility-owned transformers................ []
8. Natural gas requirements (start and peak)..................... []
a. mcf/year................................................... []
b. mcf/hour................................................... []
9. Alternate fuel requirements................................... []
10. Water requirements (start and peak)........................... []
a. Sanitary gpd............................................... []
b. Process water gpd.......................................... []
c. Air conditioning gpd....................................... []
d. Cooling water gpd.......................................... []
e. Percent to be recirculated................................. []
f. Special characteristics (purity, temperature, pressure, chemical
content, salinity, hardness, etc.)......................... []
g. Type of fire protection required........................... []
h. Sinks, drinking fountains required......................... []
11. Sewage and waste treatment (start and peak)................... []
a. Sanitary gpd............................................... []
b. Process gpd................................................ []
c. Special waste treatment required........................... []
d. Solid wastes............................................... []
12. Provisions for unusual or special operations.................. []
a. Fire, explosion or health hazards associated with materials used
in process................................................. []
b. Conditions resulting from operation (dust, odors, fumes, smoke,
noise, vibration, etc.).................................... []
c. Special treatment required (smoke abatement, dust extraction,
etc.)...................................................... []
d. Security risks to which operation may be exposed........... []
e. Computer room.............................................. []
13. Safety equipment.............................................. []
a. Safety shower.............................................. []
b. Eye wash................................................... []
c. Sprinklers................................................. []
d. Fire hose.................................................. []
e. Extinguishers.............................................. []
f. Fire water storage......................................... []
14. Communications requirements................................... []
a. Special site requirements for antennae, satellite reception,
microwave, radio, etc...................................... []
b. Services available at site................................. []
c. Requirements within facility............................... []
-- Telephones (voice, voice/data).......................... []
-- Time clocks............................................. []
-- Other clocks............................................ []
-- Paging systems.......................................... []
-- Music................................................... []
15. Security/disaster preparedness requirements................... []
a. Access to site, building................................... []
b. Self-contained services.................................... []
-- Power................................................... []
-- Water................................................... []
-- Fuel storage............................................ []
c. Perimeter protection....................................... []
d. Screening of site, building................................ []
e. Protection against natural, man-made disasters............. []
16. Total land area required...................................... []
a. Number of acres for plant, roads, rail, parking, storage,
utilities, easements....................................... []
b. Special configurations or characteristics (shape of tract,
orientation, elevation, soil bearing, etc.)................ []
c. Recreation................................................. []
d. Landscaping................................................ []
e. Acres to be fenced, paved.................................. []
[Next Page]|
[Return to Checklist]|
[Home page]
Copyright 1995 Conway Data, Inc. All rights reserved
Legal Notice: Because data comes from many sources, Conway Data
can assume no responsibility for accuracy or currency.