IV. ENERGY AND UTILITIES
IV. Energy and Utilities: Electric, Gas, Communications
A. Power Source....................................................... []
1. Thermal- coal, natural gas, propane, fuel oil, lignite......... []
2. Hydroelectric.................................................. []
3. Other- nuclear, geothermal, solar.............................. []
4. Tax credit available for use of specific equipment or fuel
to generate power.............................................. []
B. Electric Power Supply.............................................. []
1. Company or public agency serving area.......................... []
2. Interconnection with other systems............................. []
3. Capacity- present and planned.................................. []
4. Recent record of shortages or interruptions.................... []
5. Vulnerability to natural disasters............................. []
6. Location of nearest electric substations and whether interlocking[]
7. Voltage, phase and cycle available............................. []
8. Size of connection at proposed site............................ []
9. Two-way feed................................................... []
10. Rates based on your demand for services........................ []
a. Lighting................................................... []
b. Machine operation.......................................... []
c. Air conditioning........................................... []
d. Welding.................................................... []
e. Furnaces................................................... []
11. Cost of extending service...................................... []
12. Typical residential rates...................................... []
13. Off-peak possibilities......................................... []
14. Fuel adjustment provisions..................................... []
15. Rate of return on capital investment........................... []
16. Current fuel generation mix.................................... []
17. Ongoing power plant construction............................... []
18. Planned power plant construction............................... []
19. Fuel generation mix when the new capacity is on line........... []
20. Present and projected reserve margins.......................... []
21. Past and projected consumption growth.......................... []
22. Record of service reliability to local manufacturers........... []
23. Rate relief granted in last few years.......................... []
24. Amount of the next rate hike request........................... []
25. Composition of the state public utility commission............. []
26. Net bonded indebtedness........................................ []
27. Bond rating.................................................... []
28. Whether the company is a net exporter or importer of power..... []
29. If a substantial portion of power is bought from other companies,
the nature of the contracts.................................... []
C. Gas Service........................................................ []
1. Suppliers...................................................... []
2. Capacity, present and planned, as compared with peak requirements[]
3. Allocation for industrial use.................................. []
4. Type (natural, mixed, manufactured) and Btu value.............. []
5. Storage facilities............................................. []
6. Recent record of shortages and interruptions................... []
7. Size of connection at proposed site............................ []
8. Two-way feed................................................... []
9. Industrial and residential rates, including interruptible rate. []
D. Coal, Oil.......................................................... []
1. Suppliers...................................................... []
2. Cost of coal delivered, per million Btu's...................... []
3. Cost of oil delivered, per million Btu's....................... []
E. Potential for On-Site Independent Energy Source.................... []
1. Gas Well....................................................... []
2. Coal mine...................................................... []
3. Nuclear reactor................................................ []
4. Other.......................................................... []
5. Ecological permits required.................................... []
6. Available infrastructure of skilled workers.................... []
F. Potential for Location In an Energy Park Complex (which includes waste
recovery plant, generating station, etc.).......................... []
1. Specific design factors required for location.................. []
G. Other Special Energy Plans......................................... []
1. Alternate fuel plan............................................ []
a. Price of alternate fuels................................... []
2. Cogeneration................................................... []
3. Back-up system................................................. []
H. Motor Fuel......................................................... []
1. History of shortages in area................................... []
2. Cost of fuel................................................... []
I. Communications..................................................... []
1. Local Telephone company........................................ []
a. Number of instruments in use vs. capacity.................. []
b. Capability of handling large installations................. []
c. Teletype service........................................... []
d. Private wire system........................................ []
e. Range of toll free area.................................... []
2. Need for new communications system............................. []
a. Digital transmission service............................... []
b. Microwave and satellite transmission service............... []
c. Telecommunications......................................... []
3. Postal service................................................. []
a. Nearest post office........................................ []
b. Frequency of deliveries.................................... []
c. Proximity of a Bulk Mail center............................ []
[Next Page]|
[Return to Checklist]|
[Home page]
Copyright 1995 Conway Data, Inc. All rights reserved
Legal Notice: Because data comes from many sources, Conway Data
can assume no responsibility for accuracy or currency.