IX. WATER AND WASTE


IX.  Water and Waste

  A.  Regional Water Situation...........................................  []
      1.  Trend of consumption as compared with developed supplies, planned
          developments...................................................  []
      2.  Watershed development proposals for export of water to or import
          from other watersheds..........................................  []

  B.  Local Water Supply.................................................  []
      1.  Agency and source of supply....................................  []
      2.  Pumping and storage supply.....................................  []
      3.  Average and maximun use as compared with present or proposed
          supply.........................................................  []
      4.  Supply vs. projected demand....................................  []
      5.  Pressure at site...............................................  []
      6.  State health department rating of supply.......................  []
      7.  Method and extent of treatment, including fluoridation.........  []
      8.  Industrial and residential rates...............................  []
      9.  Chemical analysis..............................................  []
          a.  Hardness...................................................  []
          b.  Alkalinity-acidity.........................................  []
          c.  Solids.....................................................  []
          d.  Oxides, chlorides, nitrates, sulfates......................  []
     10.  Cost of extending service......................................  []
     11.  Likelihood of restricted use...................................  []

  C.  Surface Water- Streams and Lakes...................................  []
      1.  Daily, seasonal and long-term flow variations..................  []
      2.  Upstream use...................................................  []
      3.  Temperature....................................................  []
      4.  Chemical analysis ( same as above )............................  []
      5.  Distance to site...............................................  []
      6.  Feasibility of dam or pumping station..........................  []

  D.  Ground Water- Wells................................................  []
      1.  Recent trend of water table elavation..........................  []
      2.  Recharge rate..................................................  []
      3.  Regulations on use.............................................  []
      4.  Pumping cost...................................................  []
      5.  Temperature, chemical analysis.................................  []

   E.  Sea water.........................................................  []
      1.  Cost of desalination...........................................  []
      2.  Potential corrosion problems...................................  []

   F.  Waste Water, Sewage Disposal......................................  []
      1.  Direct waste water discharge...................................  []
          a) Proximity of stream.........................................  []
          b) Size of stream..............................................  []
          c) Stream classification.......................................  []
          d) Existing discharges.........................................  []
          e) Total cost of disposal via this method......................  []
      2.  Land application, spray irrigation.............................  []
          a) Soil characteristics........................................  []
          b) Elevation of water table....................................  []
          c) Precipitation pattern.......................................  []
          d) Area on site for lagoon, lines..............................  []
          e) Septic tank regulations.....................................  []
          f) Total cost of disposal via this method......................  []
      3.  Municipal treatment system.....................................  []
          a) Proximity to sewer line.....................................  []
          b) Size of line................................................  []
          c) Excess capacity of existing treatment plant.................  []
          d) Moratorium on new users?....................................  []
          e) Separate sanitary and storm sewers..........................  []
          f) Secondary treatment.........................................  []
          g) Total cost of treatment via this method.....................  []

  G.  Solid Waste Disposal Via Public Agency.............................  []
      1.  Agency and nature of collection system-incineration, landfill or
          dump, transfer stations, resource recovery.....................  []
      2.  Methods and frequency of collection............................  []
      3.  Capacity compared with present and projected load..............  []
      4.  Total cost of disposal via this method.........................  []

  H.  Solid Waste Disposal On Site.......................................  []
      1.  Regulations which must be complied with........................  []
      2.  Public relations aspects.......................................  []
      3.  Staff requirements for special personnel.......................  []
      4.  Total costs via this method....................................  []

  I.  Solid Waste Disposal Off Site......................................  []
      1.  Availability of private service................................  []
      2.  Legal liabilities .............................................  []
      3.  Limitations on materials handled...............................  []
      4.  Total cost via this method.....................................  []

  J.  Solid Waste Disposal Via Recycling ................................  []
      1.  Economic feasibility...........................................  []
      2.  Regulations which must be complied with........................  []
      3.  Staff requirements.............................................  []
      4.  Total cost via this method.....................................  []